Exhibition

Home > Exhibition > Content
Air curtain installation
Feb 07, 2017

An air curtain, air curtain machine air curtain machine air curtain installation requirements
1. the machine should be installed in a door frame
2. the door width must be less than or equal to the air curtain length and (if the door is too wide, to connect the number of curtain machines installed).
3. the mounting plate must be firmly connected to the wall (or post) to prevent loosening due to vibration.
Second, air curtain machine air curtain machine air curtain machine air curtain installation method
Mounting plate installation method:
Example: installation on a concrete wall. According to the location of the holes on the mounting plate, arrange the relative sizes of the 8 bolts M10x60, embedded in cement and bolts. Then fasten the mounting plate on it. Or punching directly on the concrete wall, with expansion screws.
1. be fully fixed mortar and fasten the mounting plate washer nut on the bolt, 8 bolts fixed on the concrete wall or door frames;
2. the body hanging angles must be inserted in the mounting holes on the mounting plate.







Copyright © Shenyang Jinchen Weiye Cooling & Heating Equipment Co.,Ltd All Rights Reserved.Tel: +86-24-83970918